Production release engineering as one system - risk tiers, lock-aware migrations, gated rollouts, signed go/no-go, rollback order, and incident command in a shared Release Dossier.
Six skills that run a production release end to end and share one artifact, the Release Dossier: a fixed-section markdown file each skill reads and appends to, so the risk class decides the controls, the migration plan names its point of no return, the rollout gates feed the abort decision, and the incident log becomes the postmortem timeline. Classify a change into R0-R3 with falsifiable criteria; plan expand/contract migrations with the exact PostgreSQL and MySQL 8 lock each statement takes, plus a zero-dependency Postgres migration linter; ramp with numeric abort gates against a concurrent baseline; sign a go/no-go with explicit no-go triggers and a pre-mortem; decide rollback versus roll forward with an ordered procedure and a list of what can never be reversed; and command the incident through to a blameless postmortem with owned action items. Tool-agnostic: any flag system, any CI, Postgres or MySQL.
Click to play with sound.
Arranged in the author's recommended order. Walk through them in sequence, or open any one on its own.
Classifies a production change into risk tier R0-R3 using falsifiable criteria (data shape changes, irreversible side effects, auth/payment/PII paths, blast radius, traffic share, time to revert), assigns the controls each tier requires.
Plans and lints production schema changes as expand/contract phases with the exact lock each PostgreSQL or MySQL 8 statement takes, lock_timeout guards, throttled batched backfills, dual-write and read cutover, and a verification plus reversal per phase.
Designs a canary and percentage rollout with numeric abort gates expressed relative to a concurrent baseline (error rate, p95/p99 latency, saturation, one business KPI), minimum sample sizes, bake times per step.
Runs a release readiness review that ends in a signed, timestamped go/no-go record in the Release Dossier – checks the evidence each risk tier requires, applies explicit no-go triggers.
Decides whether to roll back or roll forward a bad release using a fixed procedure (data compatibility between versions, current migration phase, measured time to revert versus time to fix, customer impact rate).
Runs a production incident from declaration to blameless postmortem – SEV1-SEV4 levels with measurable criteria, the four roles (incident commander, comms, ops, scribe) and what each must and must not do.